Yasmeen Rotana Hotel Damascus Back to projects
From many competitors Hovag has been subcontracted by Arabtec construction Dubai to provide the power distribution system.
Our engineering team has been actively involved in the project with
contractor and consultant to redesign load schedule.
Our supplies encompassed the Low Voltage main and
secondary power distribution boards, motor control center and busbar
trunking system.